Bathroom Progress as of 7/31/07

Hello Everyone!! It has been awhile since my last post but alas I have some bathroom progress to report!! The first picture is of the vanity/sink. Above this will be a mirror that will take up most of the space above the vanity with track lighting on the pitched ceiling. The second picture is of the shower/jetted tub. Above where the ladder currently is will be a plexiglass window to allow some natural light into this room (the ladder, of course, will not be a part of the bathroom :-) The last picture is where the toilet will be. It is a toilet...nothing more to say.
Our plumber has us scheduled for August 23rd to come in and hook up all the fixtures. This means we have 23 days to finish the drywall (which we are almost done with - we are waiting to do the shower wall until the last possible minute as it will prevent any of the air conditioning to get into that area...and it is too freakin hot in there to begin with!!). We also have to finish the flooring (which means we need to pick it out and purchase it...along with gathering some experienced hands to help out) and hopefully paint the walls. We shall see if we can get this all done or if we will have to reschedule with him AGAIN!!!!
I will share picutres of the closet in a different post as I am having issues uploading all the pictures and I don't have the energy to fight with it now!!